Intel 20A
As part of Intel’s Innovation 2023 conference, the company is not only showing off their current and soon-to-be-current products like Meteor Lake, but the forward-looking keynote by CEO Pat Gelsinger was also used to showcase future generations of Intel products. Perhaps the biggest surprise this year being Intel’s Lunar Lake platform, which is already up and running to the point where Intel can do demos on it. Lunar Lake is Intel’s 2025 client platform, which is scheduled to arrive after Meteor Lake (very late 2023) and Arrow Lake (2024). At last disclosure from Intel, it is going to be a brand-new platform, replacing the shared Meteor/Arrow platform. At this point, confirmed details are few and far between, other than that it will be bigger and...
Intel to Spend Tens of Billions on New Fabs in Germany and Israel
Intel is spending tens of billions of dollars on new fabs in Arizona and Oregon, but the company's ambitions certainly do not end in the U.S. This month the...
28 by Anton Shilov on 6/21/2023Intel Details PowerVia Chipmaking Tech: Backside Power Performing Well, On Schedule For 2024
At next week’s annual VLSI Symposium, Intel will be presenting a pair of highly-anticipated papers about their progress with their upcoming PowerVia chip fabrication technology – the company’s in-development...
31 by Ryan Smith on 6/5/2023AnandTech Interview with Dr. Ann Kelleher: EVP and GM of Intel’s Technology Development
It’s somewhat of an understatement to say that Intel’s future roadmap on its process node development is one of the most aggressive in the history of semiconductor design. The...
13 by Dr. Ian Cutress on 2/18/2022Bringing Geek Back: Q&A with Intel CEO Pat Gelsinger
One of the overriding key themes of Pat Gelsinger’s ten-month tenure at Intel has been the eponymous will to ‘bring geek back’ to the company, implying a return to...
49 by Dr. Ian Cutress on 10/29/2021Intel’s First High-Profile IFS Fab Customer: Qualcomm Jumps on Board For 20A Process
Alongside Intel’s sizable announcement today regarding their manufacturing roadmap over the next half-decade, the company is also announcing their first major customer for their third-party foundry service, IFS. And...
59 by Ryan Smith on 7/26/2021Intel's Process Roadmap to 2025: with 4nm, 3nm, 20A and 18A?!
In today’s Intel Accelerated event, the company is driving a stake into the ground regarding where it wants to be by 2025. CEO Pat Gelsinger earlier this year stated...
326 by Dr. Ian Cutress on 7/26/2021